From Concept to Layout: How Early Design Decisions De-Risk Delivery
Time: 11:45 - 12:00
Date: 15 April 2026
Synopsis
Solar and solar + storage projects are won or lost on early decisions—before drawings are “final.” This panel looks at how constraints and equipment assumptions ripple into permitting, procurement, construction sequencing, and O&M, and how better option testing upfront reduces late surprises.
- Why early layouts create downstream risk when they’re built on thin assumptions
- How to compress feasibility cycles while keeping outputs credible for stakeholders
- Where automation reduces handoffs, inconsistency, and late-stage redesign
- How land, interconnection strategy, equipment selection, and storage integration shape layout logic
- What “delivery-ready” design means early: fewer surprises in permitting, procurement, construction, and long-term operations
Speaker
Maksim Markevich CTO - PVFarm