Informa helps businesses and professionals in hundreds of ways.

Our international portfolio of live events, world-leading research publications, and innovative digital services provide specialists with the knowledge and connections they need to thrive.

Alex O’Cinneide

CEO

Gore Street Capital

Alex O’Cinneide is CEO of Gore Street Capital where he manages significant capital on behalf of institutional investors for renewable investments. He previously was a Managing Director and Head of Europe for Paladin Capital, a Senior Advisor to Kleinwort Benson Bank in London, served on the Investment Committee of IndoChina Capital (an Oryx Corp Asia Renewables fund); and from 2006 to 2013 was Head of Investments for Masdar, Abu Dhabi’s USD15 Billion SWF. Alongside those commercial activities he is a trustee of the London Irish Centre, a UNICEF Advisor and chairs their Climate Change Committee, is a visiting research to the Energy Policy Group in Cambridge University, a Fellow of the Royal Geographical Society, and is the Vice Chair of the board of the Biomimicry Institute. Alex O’Cinneide holds a BA and a MA from Trinity College Dublin, a MSc from the London School of Economics and a MSc from the London Business School. He is a published author on many topics and is a regular speaker on venture capital and private equity, and recognized as one of the global leaders in the field of renewable investing.

Panel discussion

This session examines how a utility-scale solar project retrofitted or built with co-located battery storage to address curtailment, price cannibalisation, and grid constraints performs. The focus is on what changed financially and operationally once storage was added, and what the asset owner would do differently today.

  • Why storage was added?
  • Curtailment exposure, capture price erosion, or grid compliance requirements
  • How the revenue stack changed: Energy shifting, ancillary services, downside protection, and volatility reduction
  • Capital and performance outcomes: Capex uplift, IRR impact, payback period, and lessons for future hybrid projects