Maksim Markevich

CTO

PVFarm

As the CTO at PVFARM, Maksim channels his love for solving design automation challenges and his dedication to delivering cutting-edge solar PV design software. With an M.E. in Nuclear Power Plant Construction and ten years of experience building software products for the AEC industry, Maksim possesses a unique blend of skills. His expertise in technology and engineering intricacy drives his innovative approach to design automation. Maksim is deeply motivated by the promise and impact of green energy, continuously pushing the boundaries to advance solar PV design and engineering.

Solar and solar + storage projects are won or lost on early decisions—before drawings are “final.” This panel looks at how constraints and equipment assumptions ripple into permitting, procurement, construction sequencing, and O&M, and how better option testing upfront reduces late surprises.

  • Why early layouts create downstream risk when they’re built on thin assumptions
  • How to compress feasibility cycles while keeping outputs credible for stakeholders
  • Where automation reduces handoffs, inconsistency, and late-stage redesign
  • How land, interconnection strategy, equipment selection, and storage integration shape layout logic
  • What “delivery-ready” design means early: fewer surprises in permitting, procurement, construction, and long-term operations